Name: Matthew A. Boykin IV
Date of Birth: 01/19/1970
Medical: First Aid & CPR Certified
Safety: OSHA 30 hour training course, USM
Education Record:
May 1998 B.S. in Construction Engineering Technology, University of Southern
Mississippi
Further Courses:
U.S.A.C.E Construction Quality Management for Contractors course
Successfully completed Metallic Metal Building Erection School
“Competent Person/Builder” cert. from Scaffold Training Institute
Successfully completed Allen’s Concrete College
Successfully completed RMS training from USACE
Employment History:
Date: 10/2004-Present Bean Stuyvesant LLC/Bean Environmental, New Orleans, LA
Vessel Manager/Superintendent
Responsible for all phases of project management for new work and environmental
remediation dredging projects. Duties include project preparation, management of
all dredging and attendant plant, including backhoe/excavator, and bucket
dredging, reporting, quality control, production, and point of contact with
client.
Date: 08/2003-06/2004 J. W. Puckett & Co., Gulfport, MS
Superintendent
Responsible for all onsite management of various projects ranging from $250,000
to $1,500,000.
Date: 05/1998-08/2003 Mike Rozier Construction Co., Hattiesburg, MS and
Greenwood, MS
Superintendent
Responsible for all onsite management of various projects ranging from $25,000
to $1,500,000.
Produced estimates and schedules for various projects. Worked closely with the
client to assure that each project was finished on time and under budget.
Recent Work Experiences:
05/2007- Present
Miami River Dredging Project, Miami, FL
Vessel-Dredging Manager/Superintendent/Quality Control Representative for new
work dredging the Miami River to -15’ MLLW. Equipment included Hitachi EX 800
Backhoe Dredge (Barredor del Rio), 2 3000 CY mud barges, 2 1500 CY mud barges,
support equipment including tugs to 2,000 HP, various construction equipment, and
all support vehicles.
02/2006-05/2007
S-KVK-2 50ft Improvement Project, New York City, NY
Blasting Supervisor/Superintendent/Quality Control Representative for new work
dredging the Kill Van Kull waterway between Bayonne, NJ and Staten Island, NY to
-50’ MLLW. Equipment included Liebherr P996 Backhoe Dredge (Tauracavor),
Liebherr P995 Backhoe Dredge (Maricavor), Drilling and Blasting Barge (Fractor),
Bucket Dredge (Bean 2), 2 5000 CY offshore dump scows, 2 3000 CY offshore dump
scows, support equipment including tugs to 3,600 HP and Crane Barge.
05/2005-02/2006 Key West Harbor Dredging 34’ Project, Key West, FL.
Operations Manager/Superintendent/Quality Control Representative for new work
dredging to deepen the Port of Key West to –34’ MLLW. Equipment included
Liebherr P995 Backhoe Dredge (Maricavor), 3 each dump scows from 3,000 CY, 3 each
3,000 CY mud barges, 24” Hydraulic Unloader, support equipment including tugs to
3,000 HP.
03/2005-05/2005 S-KVK-2 50ft Improvement Project, New York City, NY
Superintendent/Quality Control Representative for new work dredging the Kill Van
Kull waterway between Bayonne, NJ and Staten Island, NY to -50’ MLLW. Equipment
included Liebherr P996 Backhoe Dredge (Tauracavor), Bucket Dredge (Bean 2), 2
5000 CY offshore dump scows, support equipment including tugs to 3,600 HP and
Crane Barge.
10/2004-03/2005 Key West Harbor Dredging 34’ Project, Key West, FL.
Superintendent/Quality Control Representative for new work dredging to deepen
the Port of Key West to –34’ MLLW. Equipment included Liebherr P995 Backhoe
Dredge (Maricavor), 3 each dump scows from 3,000 CY, 3 each 3,000 CY mud barges,
24” Hydraulic Unloader, support equipment including tugs to 3,000 HP.
Equipment Used:
Liebherr P996 Backhoe Dredge; Liebherr P995 Backhoe Dredge; Bucket Dredges to
24 CY +; Bucket Dredges to 12 CY; Dump Scows 3,000 CY – 5,000 CY; Hydraulic
Unloader 24”; Tugs and Workboats 200 HP – 3600 HP; Various types of equipment
used in Commercial Construction.
Software Used:
Microsoft Excel, Project, Word, Outlook, Access. |