Mechanical Superintendent-SNC Lavalin (2009)
EMAL power project- Abu Dhabi, United Arab Emirates; Middle East.
This project is a 2,000MW gas powered combined cycle power plant
Responsible for the complete construction and oversight of errection and
mechanical assembly of a 32 cell FRP cooling towers, as well as all the quality
inspections related to this project.
Responsible for the complete construction and oversight of mechanical
installation and assembly, as well as all the quality inspections related to this
project.
Responsible for the complete and oversight of the entire civil underground
220kv duct bank road crossings, as well as all the quality inspections related to
this project.
Consulting Construction Manager ( C.M.C. ) “Solvent Extraction Electro-Winning
Upgrades (SXEW) Project “ BHP Billiton; Pinto Valley (2008)
Responsible for construction and oversight for all capital projects issued
by B.H.P. engineering department.
Responsible for all construction and demolition activites associated with
the SXEW upgrades.
Responsible for setup and construction of a dewatering system
Pre-commissioning & Commissioning Superintendent Consulted (C.M.C.)
BHP Billiton; Pinto Valley (Copper Mine) Restart Project (2007)
Responsible for mechanical oversight of start-up and commissioning
activities for all facets of the Pinto Valley Mine Complex. These activities
included all areas of the process such as Gyratory crushers, conveyor systems,
cone crushers, ball mills, floatation circuit, filter plant circuit, water
treatment circuit, dewatering, lime circuit
Superintendent - Flour Daniels
TS Power Project (2006)
Responsibilities included oversight and direction to all crafts associated
with the mechanical construction on this 500 MW power plant. Responsibilities
also included commissioning and start-up.
The oversight and installation of pulverizers, boiler feed pumps, cooling
towers, water treatment pumps and equipment. All air compressors and piping, lime
silos construction and lime distribution.
Precision Millwright/Process & Underground Maintenance Superintendent
“Schmusser & Associates, The Industrial Company (TIC), and Barrick Gold strike
Various Mine Sites throughout Nevada (2003-2005)
Responsible for all process and underground maintenance, including precision
maintenance. Responsibilities also included supervision and performance of all
precision millwright activities at two Newmont facilities (Phoenix Project)
Demolition/Construction Superintendent power outages
S NV, UT, NB (2003)
Responsible for all demolition and new construction activities on the carbon
and leach system project. Responsibilities included design oversight and input,
construction schedule and budget, quality control, and construction close-out.
Responsible for all mechanical work giving to S&R. Worked on several power
plants in Nevada, Utah, Nebraska.
General Foremen/Foreman
California Industrial Rubber “ Elko, Nevada (2001-2003)
Responsibilities included the supervision of hot vulcanizing, cold bond
repairs, lagging and rubber linings, and mechanical splicing during maintenance
shutdowns. (Certified in all Scandura products and installations)
Svedala Industries “ Elko, Nevada (2000-2001)
Journeyman Millwright/Mechanic
Pabco Gypsum - Henderson, Nevada (2000); Echo Bay Minerals - Battle Mountain,
Nevada (1997-1999)
|