04/16/09 Valve Tech- Surry Nuclear Power Plant-Surry, VA
05/09/09 valve repacks Supervisor-Tom Sholl
03/05/09 Mechanic-North Anna-Mineral Va.
03/26/09 Secondarys-Supervisor-Bill Dooley
10/13/08 Valve Tech- Vermont Yankee
11/08/08 repacks. Pressure seal, butterfly, check valves
.
09/11/08 Valve Tech- North Anna Nuclear Plant-Mineral, Va.
10/04/08 Valve repacks, chesterton packing
05/05/08 Valve Tech- Catawba Nuclear Plant- York S,C,
05/30/08 General Valves- Kerotest. Repacks
04/07/08 Valve Tech- Oconee Nuclear Plant- Senaca S,C,
05/02/08 General Valves=Repacks
02/18/08 Valve Tech- McGuire Nuclear Plant- Huntersville N,C,
04/02/08 General Valves-repacks using chesterton.argo packing,
Gate, Globe, Plug,
12/11/07 Outside Machinist- N.I.C.- USS Carl Vinson
01/27/08 Hydro main steam system, Main condensate pumps
10/21/07 Valve Tech - Surry Power Plant-Surry Va.
11/15/07 valve repacks. Secondary’s, heat exchangers,
condensers. Plugged tubes using pop it plugs,
replaced gaskets on baffle plates. Used hy-torque
to reinstall man-ways.
Supervisor- Forrest Mills
10/01/07 Valve Tech - Shearon Harris Nuclear Power Plant
10/19/07 Fin Team, IV for I&C
Supervisor-Bill Bridges/ Kelvin Nalls
09/06/07 Valve Tech - North Anna Nuclear Power Station, Mineral, Va.
09/28/07 Secondary side.
Supervisor- Bill Dooley
03/26/07 Valve Tech - Millstone Nuclear Power Plant-Waterford, Ct
05/05/07 unpack 3 tier loop stop valves using water extractor and repack.
assisted on AOV'S. pressure seal valves, gate, globe, plug.
simmer testing. supervisor Ian Ross
02/24/07 Valve tech - Brunswick Nuclear Plant-Southport, N.C.
03/24/07 HCU'S-detention and change out diaphragms
10/23/06 Mechanic - Surry Nuclear Power Plant, Surry Virginia
11/11/06 Feedwater Heat Exchangers, baffle plate and gasket, new studs
nuts, gasket for cover, torque cover. valve repacks
Supervisor- Forrest Mills
09/11/06 Valve tech - Cook Nuclear Plant- Bridgeman, Michigan
10/18/06 refurbish or replacement of check, duocheck,gate,globe,ball
neddle, plug, poppett valves
Supervisor- Frank Pappa
04/06/06 Valve Tech - Shearon Harris Nuclear Power Plant
05/04/06 Refurbished needle, check, duo check, pressure seal valves
Supervisor- LG Hall
03/13/06 Valve Tech - Nine Mile Nuclear Power Station-Oswego, N.Y.
04/04/06 valve repacks, Argo packing
09/28/05 Mechanic - North Anna Nuclear Power Station
10/22/05 Mineral, Virginia – Refueling Team.
Detentioning, removal and cleaning of reactor head studs,nuts,
washers. refurbish of penetration valve,inspection,
installation of RH o rings, setting of
seal ring,tensioning of rh studs, reinstall rh cable trays
and supports.
04/25/05 Valve Tech - Surry Nuclear Power Plant, Surry Virginia
05/18/05 Feedwater Heat Exchangers, baffle plates and gasket,new studs
for cover. Valve repacks- Argo/ Chesterton Packing
Supervisor- Forrest Mills
03/14/05 Valve Tech - Nine Mile Nuclear Plant, Oswego NY
04/20/05 Refurbish of Fisher AOV’S, AOV actuators, Ball Valves-Bluing
and seating, valve repacks-chesterton/argo packing
Supervisor- charlie
09/27/04 Valve Tech - DC Cook Nuclear Power Station
10/31/04 refurbish of Lunkenhiemers, valve-repacks, disassembly,
reassembly of main steam check valve
Supervisor- Charles Larrison
04/18/04 Mechanic - North Anna Nuclear Power, Mineral, VA
05/22/04 Refueling team- detentioning and removal of reactor head studs,
studs, washers and nuts
03/01/04 Valve Tech - Nine Mile Nuclear Plant, Oswego, NY
04/15/04 Valve repack crew, asbestos qualified
08/04/03 Valve Tech - DC Cook Plant, Bridgeman, MI
11/18/03 MSIV’S Walk down crew, Parts Specialist
Supervisor: Frank Golden / Mike Ketchel
04/28/03 - Mechanic - DC Cook Plant, Bridgeman, MI
06/11/03 Inhouse, Firewatch
Supervisor: Mike Ketchel
03/17/03 Valve Tech - The Atlantic Group, Norfolk, VA.
03/21/03 Refurbished Limitorques.
Supervisor: John McLaughlin
02/23/03 Mechanic - North Anna Nuclear Power Station, Mineral, VA
03/16/03 Refueling team - Detentioning and removal of Reactor head
studs, washers and nuts. Refurbished Fisher A.O.V.’s.
Supervisor: Hank Snoddy
10/05/02 Valve Tech - Robinson Nuclear Power, Hartsville, SC
11/01/02 Valve shop, refurbished Anchor Darling CCI Valves and Fisher’s,
A.O.V.'S
09/05/02 Mechanic - North Anna Nuclear Power Station, Mineral, VA
10/03/02 Refueling team - Detentioning and removal of reactor head, R.H.
studs, washers and nuts. Refurbished Fisher A.O.V.’s.
Supervisor- Hank Snoddy
06/03/02 Valve Tech – - National Inspections & Consultant - USS nterprise
08/25/02 Installed 46”, 42”, 28”, 10” and 6” valves, wasters, and on
sea
chest for main condenser
Supervisor: Dave Wauhop
04/09/02 Mechanic - DC Cook Nuclear Plant, Stevensville, MI
05/30/02 Heat exchanger crew, disassembly and removal from plant, 3 heat
exchangers
03/06/02 Valve Tech - Nine Mile Nuclear Plant, Oswego, NY
03/30/02 Valve repack crew, asbestos qualified.
Supervisor: Tom Cinero
10/01 Mechanic - Surry Nuclear Power Plant
11/01 Perform quarterly PM’s on traveling water screens, greased and.
lubed,replaced screens, reassembly of traveling water screens
structures, chains, pins, shaft,wheels, PM's on vacume pumps
Supervisor: Hudson Hudgins
09/01 Mechanic - North Anna Power Plant
10/01 Refueling team, reinstallation of mirrored insulation on
reactor, freeze seal team
04/01 Valve Tech - HB Robinson Power Plant
05/01 Worked in valve shop on various valves, cleaned water boxes,
and turbine deck
Suporvisor: Joe Outlaw
03/01 Mechanic - North Anna Power Plant
04/01 Worked on refueling team, installed o-rings and gaskets on
air activating valves removal of insulation from reactor,
reinstallation of bolts on reactor, disassembly and
reassembly main steam stop valve
Supervisor- Hank Snoddy
08/2000 Mechanic - DC Cook Power Station
11/2000 Worked in crane bay, bag cutter, bag catcher, pallet jack
operator,platfom tech, ice chopper, ice pusher, pin team
lower condenser
Supervisor-Andrew Zemke
04/2000 Mechanic - Surry Power Station
05/2000 Low Level, overhauled main circulating water pump, repacked
bearings,installed impeller, discharge elbow, 96 inch expansion
joint,quarterly pm's on traveling water screens. Greased,
lubed and replaced screens.
Supervisor: Hudson Hudgins
03/2000 Mechanic - North Anna Station
04/2000 Disassembly and reassembly of main steam trip valve, installed
o-rings, gaskets, on air actuating valves, replaced Vogt and
Anchor Darling valves, removal of mirrored insulation from
reactor,removed diesel cockpit covers for blowdown and
oil analyis. Reinstalled reactor head bolts
Supervisor- Hank Snoddy
EDUCATION
03/2007 State of Connecticut VT2-Licence
03/2000 Basic Radworker, Firewatch, Asbestos, Lead
North Anna Training Center
01/1990 Choice Hotels- Night Auditor
03/2000
08/1988 G.E.D., Norfolk, VA
.
05/1979-8/1979 Boiler Technician “A” School, Great Lakes IL.
10/1977-4/1979 N.A.S. Bermuda: Completed course and qualified to stand
watch on, One-1600 kW Fairbanks and Morse: one-Gas
turbine 750 KW; four 1500KW Worthingtons; one-gas turbine
2000 kw Williams and Lane; one-1410 KW English Electric;
0ne-Diesel Muse 750 KW
8/1977-9/1977 Apprentice Training Division, (USN), Boiler Operations,
steam Principle, Great Lakes, IL.
10/1976-11/1989 United States Navy
|