04/16/09 Valve Tech- Surry Nuclear Power Plant-Surry, VA
05/09/09 valve repacks
Supervisor-Tom Sholl
03/05/09 Mechanic-North Anna-Mineral Va.
03/26/09 Secondarys
Supervisor-Bill Dooley
10/13/08 Valve Tech- Vermont Yankee
11/08/08 repacks. Pressure seal, butterfly, check valves
09/11/08 Valve Tech- North Anna Nuclear Plant-Mineral Va
10/04/08 Valve repacks, chesterton packing
05/05/08 Valve Tech- Catawba Nuclear Plant- York S,C,
05/30/08 General Valves- Kerotest. Repacks
04/07/08 Valve Tech- Oconee Nuclear Plant- Senaca S,C,
05/02/08 General Valves
02/18/08 Valve Tech- McGuire Nuclear Plant- Huntersville N,C,
04/02/08 General Valves-repacks using chesterton.argo packing,
Gate, Globe, Plug,
12/11/07 Outside Machinist- N.I.C.- USS Carl Vinson
01/27/08 Hydro main steam system, Main condensate
Pumps
10/21/07 Valve Tech - Surry Power Plant-Surry Va.
11/15/07 valve repacks. Secondary’s, heat exchangers,
condensers. Plugged tubes using pop it plugs,
replaced gaskets on baffle plates. Used hy-torque
to reinstall man-ways.
Supervisor- Forrest Mills
10/01/07 Valve Tech - Shearon Harris Nuclear Power Plant
10/19/07 Fin Team, IV for I&C
Supervisor-Bill Bridges/ Kelvin Nalls
09/06/07 Valve Tech - North Anna Nuclear Power Station, Mineral, Va.
09/28/07 Secondary side.
Supervisor- Bill Dooley
03/26/07 Valve Tech - Millstone Nuclear Power Plant-Waterford, Ct
05/05/07 unpack 3 tier loop stop valves using water extractor and
repack,assisted on AOV'S. pressure seal valves, gate,
globe, plug. simmer testing. supervisor Ian Ross
02/24/07 Valve tech - Brunswick Nuclear Plant-Southport, N.C.
03/24/07 HCU'S-detention and change out diaphragms
10/23/06 Mechanic - Surry Nuclear Power Plant, Surry Virginia
11/11/06 Feedwater Heat Exchangers, baffle plate and gasket, new
studs,nuts, gasket for cover, torque cover. valve repacks
Supervisor- Forrest Mills
09/11/06 Valve tech - Cook Nuclear Plant- Bridgeman, Michigan
10/18/06 refurbish or replacement of check, duo heck,gate,lobe,
ball,needle, plug,poppet valves
Supervisor- Frank Pappa
04/06/06 Valve Tech - Shearon Harris Nuclear Power Plant
05/04/06 Refurbished needle, check,duo check,pressure seal valves
Supervisor- LG Hall
03/13/06 Valve Tech - Nine Mile Nuclear Power Station-Oswego, N.Y.
04/04/06 valve repacks, Argo packing
09/28/05 Mechanic - North Anna Nuclear Power Station
10/22/05 Mineral, Virginia – Refueling Team.
Detentioning, removal and cleaning of reactor head
studs,nuts, Washers.Refurbish of penetration drain
valve,Inspection, Installation of RH o rings,
setting of seal ring, tensioning of RH studs, asst. with
reinstalling, RH cable trays,supports.
Supervisor- Hank Snoddy
04/25/05 Valve Tech - Surry Nuclear Power Plant, Surry Virginia
05/18/05 Feedwater Heat Exchangers, baffle plates and gasket, new
studs,nuts,gasket for cover.Valvrepacks Argo/chesterton
Supervisor- Forrest Mills
03/14/05 Valve Tech - Nine Mile Nuclear Plant, Oswego NY
04/20/05 Refurbish of Fisher AOV’S, AOV actuators,ball valves-
blueing and seating, Valve
repacks-Chesterton/Argo packing
Supervisor- charlie
09/27/04 Valve Tech - DC Cook Nuclear Power Station
10/31/04 refurbish of Lunkenhiemers, valve-repacks, disassembly,
reassembly of main steam check valve, Hopkinson England.
Supervisor- Charles Larrison
04/18/04 Mechanic - North Anna Nuclear Power, Mineral, VA
05/22/04 Refueling team- detentioning and removal of reactor head
studs, cleaned R.H.studs, washers and nuts
03/01/04 Valve Tech - Nine Mile Nuclear Plant, Oswego, NY
04/15/04 Valve repack crew, asbestos qualified
08/04/03 Valve Tech - DC Cook Plant, Bridgeman, MI
11/18/03 MSIV’S Walk down crew, Parts Specialist
Supervisor: Frank Golden / Mike Ketchel
04/28/03 Mechanic - DC Cook Plant, Bridgeman, MI
06/11/03 Inhouse, Firewatch
Supervisor: Mike Ketchel
03/17/03 Valve Tech - The Atlantic Group, Norfolk, VA.
03/21/03 Refurbished Limitorques.
Supervisor: John McLaughlin
02/23/03 Mechanic - North Anna Nuclear Power Station, Mineral, VA
03/16/03 Refueling team Detentioning and removal of Reactor head
studs cleaned R.H.studs, washers and nuts. Refurbished
fisher A.O.V.’s.
Supervisor: Hank Snoddy
10/05/02 Valve Tech - Robinson Nuclear Power, Hartsville, SC
11/01/02 Valve shop, refurbished Anchor Darling CCI Valves and
fisher A.O.V.’s.
09/05/02 Mechanic - North Anna Nuclear Power Station, Mineral, VA
10/03/02 refueling team - Detentioning and removal of reactor
head studs, cleaned R.H. studs, washers and nuts.
refurbished Fisher A.O.V.’s.
Supervisor- Hank Snoddy
06/03/02 Valve Tech – - National Inspections & Consultant
08/25/02 USS Enterprise
Installed 46”, 42”, 28”, 10” and 6” valves, wasters, and
expansion joints on sea chest for main condenser
Supervisor: Dave Wauhop
04/09/02 Mechanic - DC Cook Nuclear Plant, Stevensville, MI
05/30/02 Heat exchanger crew, disassembly and removal from plant,
3 heat exchangers.
Supervisor: Bruce Metcalf
03/06/02 Valve Tech - Nine Mile Nuclear Plant, Oswego, NY
03/30/02 Valve repack crew, asbestos qualified.
Supervisor: Tom Cinero
10/2001 Mechanic - Surry Nuclear Power Plant
11/2001 Perform quarterly PM’s on traveling water screens,
greased and lubed, replaced screens, reassembly of
traveling screen structures, chains, pins, shaft,
wheels, PM’s on vacuum pumps.
Supervisor: Hudson Hudgins
09/2001 Mechanic - North Anna Power Plant
10/2001 Worked on refueling team, reinstallation of mirrored
insulation on reactor, reinstallation of bolts on
reactor Freeze seal team.
Supervisor: Hank Snoddy
04/2001 Valve Tech - HB Robinson Power Plant
05/2001 Worked in valve shop on various valves, cleaned water
boxes and turbine deck.
Supervisor: Joe Outlaw
03/2001 Mechanic - North Anna Power Plant
04/2001 Worked on refueling team installed o-rings and gaskets
on air activating valves,
removal of insulation from reactor, reinstallation of
bolts on reactor, disassembly and reassembly of main
steam stop valve.
Supervisor- Hank Snoddy
08/2000 Mechanic - DC Cook Power Station
11/2000 Worked in crane bay, bag cutter, bag catcher, pallet
jack operator, platform tech,ice chopper, ice pusher,
pin team lower condenser
Supervisor-Andrew Zemke
04/2000 Mechanic - Surry Power Station
05/2000 Worked Low Level, overhauled main circulating water
pump repacked bearings,installed impeller, discharge
elbow, 96 inch expansion joint, quarterly pm's on
traveling water screens. Greased, lubed, and replaced
screens
Supervisor: Hudson Hudgins
03/2000 Mechanic - North Anna Station
04/2000 Disassembly and reassembly of main steam trip valve,
installed o-rings, gaskets,on air actuating valves,
replaced Vogt and Anchor Darling valves, removal of
mirrored insulation from reactor removed diesel cockpit
covers for blowdown and oil analysis. Reinstalled
reactor head bolts
Supervisor- Hank Snoddy
EDUCATION
03/2007 State of Connecticut VT2-Licence
03/2000 Basic Radworker, Firewatch, Asbestos, Lead
North Anna Training Center
01/1990 Choice Hotels- Night Auditor
03/2000
08/1988 G.E.D., Norfolk, VA.
05/1979-8/1979 Boiler Technician “A” School, Great Lakes IL
.
10/1977-4/1979 N.A.S. Bermuda: Completed course and qualified
to stand watch on: One-1600 kW
Fairbanks and Morse: one-Gas Turbine 750 KW;
four 1500KW Worthingtons;one-gas turbine 2000
kw Williams and Lane; one-1410 KW English
Electric; 0ne-Diesel Muse 750 KW
8/1977-9/1977 Apprentice Training Division, (USN), Boiler
operations Steam Principles, Great
Lakes, IL.
10/1976-11/1989 United States Navy
|